91¾«Æ·ºÚÁϳԹÏ

Pengumuman Pengadaan Kapal Charter BL-WO Laycan 18-20 Juni 2013

Pengumuman Pengadaan Kapal Charter BL-WO Laycan 18-20 Juni 2013

PT. PERTAMINA (PERSERO), Marketing & Trading Directorate – Shipping, hereby invites Shipowners/Brokers to bid for a trading vessel, with the following specification, term, and condition:


AA. Open Bid System

This bid shall be proceed by an open bid system, therefore we invite all reputable shipping company as owner or as broker/agent to participate in this bid without necessarily required to provide Pertamina Bid Registration (Surat Keterangan Terdaftar/SKT).

Detail terms and conditions of the bid procedure will be presented at the prebid meeting agenda with the schedule as mentioned in this invitation to bid.


BB. Technical Specifications BL – WO

1.

DWT / Hull : About 1,500 LT
2.

Year of Built & Flag

:

1990 upÌý/ÌýIndonesia
3.

COT Capacity (98%)

:

²Ñ¾±²Ô.Ìý1,500Ìý°ä³Ü.²Ñ
4.

Safe Draft

Ìý Ìý Ìý: Ìý ÌýÌý

²Ñ²¹³æ.Ìý5Ìý²Ñ
5.

LOA

:

²Ñ²¹³æ.Ìý80Ìý²Ñ
6. Speed :

²Ñ¾±²Ô.Ìý8Ìý°­²Ô´Ç³Ù²õ
7. Type of Cargo : Clean Oil Product / White Oil (P,K,S)
8. Cargo Segregation :

²Ñ¾±²Ô.Ìý2Ìý³Ò°ù²¹»å±ð²õ
9. Cargo Oil Tank Coating : Required
10. Discharging Rate / Pressure :

Min.Ìý150ÌýKL/Hr/grade or 3 – 5 kg/cm²
11. Loading Rate :

²Ñ¾±²Ô.Ìý200Ìý°­³¢/±á°ù
12. Cargo Pump : Min. 2 Unit
13. Derrick / Crane : ²Ñ¾±²Ô.Ìý1Ìý°Õ´Ç²Ô
14. Segregated Ballast Tank : Not Required
15. Trading Area : Indonesian Waters
16. Vessel Tracking : Required
17. Lube Oil : Required Using Pertamina Product
18. Information : Internet on Board
19.

Revetting applied every

:

- 1 (one) year for vessel with YOB 0-5 years
- 6 (six) months for vessel with YOB above 5 years

Ìý

CC.Time Charter Term and Conditions

1.

Unit Vessel : 1 (one) Unit
2. Main Charter Periode : 1ÌýMonth
3. Charterers Option Period : 1+1ÌýMonth
4. Laycan : 18 – 20 June 2013
5. Pertamina Safety Approval : Required
6. Charter Party Ìý Ìý: ÌýÌý Pertatime III

Ìý

Ìý

DD.Pertamina Safety Approval (PSA) Requirement

  1. All vessels which will be offered in this bidding process are required to have Pertamina Safety Approval (PSA) issued by SMR Dept. Pertamina. This PSA shall be delivered along with the bid document at the bid closing time.
  2. Any offering submitted without Pertamina Safety Approval (PSA) will be disqualified.
  3. Referring to the above requirement, we recommend potential bidder to contact our SMR Dept for further detail regarding the Pertamina Safety Approval (PSA) procedure at the contact address below.


EE. Other Terms and Conditions & the Bid Schedule

  1. The Terms of Reference (ToR) shall be available to be downloaded at our website
  2. Bidding Schedule :

Ìý

AGENDA

DATE TIME TEMPAT
Pre Bid Meeting

14 June 2013

10:00

PT. PERTAMINA (PERSERO)
Marketing & Trading Directorate – Shipping
Jl. Yos Sudarso 32-34, Tg. Priok Jakarta
7th Floor Meeting Room

Bid Closing

17 June 2013

10:00

Ìý

CONTACT PERSON

CHARTERING DEPT. S M R DEPT.
Erfien Purwanto
+6221 4301086 Ext 8661 Ìý Ìý Ìý Ìý Ìý ÌýÌý
+62 811 930 1911 (Mobile)
erwien@pertamina.com
Asriningrum Lestari
+6221 4301086 Ext 8316
+62 816 426 2844 (Mobile)
asriningrum.lestari@pertamina.com
Vania Gita Pratiwi
+6221 4301086 Ext 8550
+62 813 2804 9046 (Mobile)
vania.pratiwi@pertamina.com
Tommy Timisela
+6221 4301086 Ext 8274
+62 81384004732 (Mobile)
tommy.timisela@pertamina.com

Ìý

Document Download

NoÌý Document Name
1Ìý Rencadan Syarat (RKS)na Kerja
2Ìý Documents Pre Bid

Share this post